近期公告
  • 03rd 十月 2024, Pre Start Meeting October 3, 2025

    Pre-Start Meeting
    Safety Notification: No individuals are to remove, adjust or alter any scaffold, propping or temporary structures under any circumstances. Without first receiving direct written permission from EMCO’s Site Management team. Always check with EMCO Site Management if you have any questions or concerns regarding scaffold, propping or temporary structures.

    SITE ACTIVITIES
    Framing, Sheeting and flushing of walls to various levels
    Mechanical ductwork install to level 1
    Formwork to various areas on GF-Level 3
    Brickwork to level 1
    Erection of perimeter scaffold , shade cloth
    Structural steel install to lintels and perimeter angle to level 1
    Fire and water services in basement to level 2
    Fire Door Install to basement


    CONTROLS
    -No parking permitted at front car bays , all trades to park at designated area
    -Exclusion zones to be maintained in high risk activity areas - Keep to designated pedestrian pathways & look out for mobile plant, trucks and warning signs.
    -Trucks reversing into site require a spotter
    -Hi Vis to be worn at all times
    -Do not alter, remove any hop ups or handrails without Site Managers approval

  • 30th 九月 2024, Pre Start Meeting September 30, 2024

    Pre-Start Meeting
    Safety Notification: No individuals are to remove, adjust or alter any scaffold, propping or temporary structures under any circumstances. Without first receiving direct written permission from EMCO’s Site Management team. Always check with EMCO Site Management if you have any questions or concerns regarding scaffold, propping or temporary structures.

    SITE ACTIVITIES
    Framing, Sheeting and flushing of walls to various levels
    Mechanical ductwork install to level 1
    Formwork to various areas on GF-Level 3
    Brickwork to level 1
    Erection of perimeter scaffold , shade cloth
    Structural steel install to lintels and perimeter angle to level 1
    Fire and water services in basement to level 2
    Fire Door Install to basement


    CONTROLS
    -No parking permitted at front car bays , all trades to park at designated area
    -Exclusion zones to be maintained in high risk activity areas - Keep to designated pedestrian pathways & look out for mobile plant, trucks and warning signs.
    -Trucks reversing into site require a spotter
    -Hi Vis to be worn at all times
    -Do not alter, remove any hop ups or handrails without Site Managers approval

现场天气预报
当前现场天气

最近更新: 17:31
温度: 20C (应用程序 17C)
风速: 19KMH
最大 风: 22KMH @14:21
自上午9点开始降雨: 0.0mm
最低温度: 17C @7:09
最高温度: 26C @12:49 2024/11/20
阵风: 28KMH
最大风力: 30KMH @13:21


观测信息来自 - Bureau of Meteorology
观测位置 - Perth、WESTERN AUSTRALIA
时区 - 澳大利亚西部标准时间
预测 - 星期四、21 十一月

Mostly sunny.
最低: 13C 最大: 24C
可能有雨。: 10%


预测信息来自 - Bureau of Meteorology
预测位置 - Perth、WESTERN AUSTRALIA
时区 - 澳大利亚西部标准时间
明天 - 星期五, 22 十一月

Sunny.
最低: 14C 最大: 27C
可能有雨。: 0%


重要现场文件
刚到这个现场吗?

您知道这个现场的PPE要求吗?

确保您在现场的第一天有正确的安全设备。

查看现场PPE要求

到达现场后尽快开始工作。

在您方便的时候在线完成现场注册,节省您的时间。

开始注册

刚到这个现场吗?

您知道这个现场的PPE要求吗?

确保您在现场的第一天有正确的安全设备。

查看现场PPE要求

刚到这个现场吗?

到达现场后尽快开始工作。

在您方便的时候在线完成现场注册,节省您的时间。

开始注册