Safety Notification: No individuals are to remove, adjust or alter any scaffold, propping or temporary structures under any circumstances. Without first receiving direct written permission from EMCO’s Site Management team. Always check with EMCO Site Management if you have any questions or concerns regarding scaffold, propping or temporary structures.
SITE ACTIVITIES
Framing, Sheeting and flushing of walls to various levels
Mechanical ductwork install to level 1
Formwork to various areas on GF-Level 3
Brickwork to level 1
Erection of perimeter scaffold , shade cloth
Structural steel install to lintels and perimeter angle to level 1
Fire and water services in basement to level 2
Fire Door Install to basement
CONTROLS
-No parking permitted at front car bays , all trades to park at designated area
-Exclusion zones to be maintained in high risk activity areas - Keep to designated pedestrian pathways & look out for mobile plant, trucks and warning signs.
-Trucks reversing into site require a spotter
-Hi Vis to be worn at all times
-Do not alter, remove any hop ups or handrails without Site Managers approval -
30th 9月 2024, Pre Start Meeting September 30, 2024
Pre-Start Meeting
Safety Notification: No individuals are to remove, adjust or alter any scaffold, propping or temporary structures under any circumstances. Without first receiving direct written permission from EMCO’s Site Management team. Always check with EMCO Site Management if you have any questions or concerns regarding scaffold, propping or temporary structures.
SITE ACTIVITIES
Framing, Sheeting and flushing of walls to various levels
Mechanical ductwork install to level 1
Formwork to various areas on GF-Level 3
Brickwork to level 1
Erection of perimeter scaffold , shade cloth
Structural steel install to lintels and perimeter angle to level 1
Fire and water services in basement to level 2
Fire Door Install to basement
CONTROLS
-No parking permitted at front car bays , all trades to park at designated area
-Exclusion zones to be maintained in high risk activity areas - Keep to designated pedestrian pathways & look out for mobile plant, trucks and warning signs.
-Trucks reversing into site require a spotter
-Hi Vis to be worn at all times
-Do not alter, remove any hop ups or handrails without Site Managers approval
現在の現場の天気
最終更新日時: 9:21
温度: 22C (アプリ 19C)
風速: 17KMH
最大風速: 22KMH @6:21
午前9時からの雨: 0.0mm
最低気温: 20C @7:33
最高気温: 30C @16:01 2025/04/03
突風: 20KMH
最大突風: 32KMH @6:21
観察場所 - Perth, WESTERN AUSTRALIA
タイムゾーン - オーストラリア西部標準時
予測 - 金曜日, 4 4月
Shower or two. Wind easing.
分: 16C マックス: 27C
降雨の可能性: 60%パーセント
予想降雨量: 0 に 3mm
予測場所 - Perth, WESTERN AUSTRALIA
タイムゾーン - オーストラリア西部標準時
明日 - 土曜日, 5 4月
Partly cloudy.
分: 17C マックス: 29C
降雨の可能性: 30%パーセント
予想降雨量: 0 に 1mm