Safety Notification: No individuals are to remove, adjust or alter any scaffold, propping or temporary structures under any circumstances. Without first receiving direct written permission from EMCO’s Site Management team. Always check with EMCO Site Management if you have any questions or concerns regarding scaffold, propping or temporary structures.
SITE ACTIVITIES
Framing, Sheeting and flushing of walls to various levels
Mechanical ductwork install to level 1
Formwork to various areas on GF-Level 3
Brickwork to level 1
Erection of perimeter scaffold , shade cloth
Structural steel install to lintels and perimeter angle to level 1
Fire and water services in basement to level 2
Fire Door Install to basement
CONTROLS
-No parking permitted at front car bays , all trades to park at designated area
-Exclusion zones to be maintained in high risk activity areas - Keep to designated pedestrian pathways & look out for mobile plant, trucks and warning signs.
-Trucks reversing into site require a spotter
-Hi Vis to be worn at all times
-Do not alter, remove any hop ups or handrails without Site Managers approval -
30th september 2024, Pre Start Meeting September 30, 2024
Pre-Start Meeting
Safety Notification: No individuals are to remove, adjust or alter any scaffold, propping or temporary structures under any circumstances. Without first receiving direct written permission from EMCO’s Site Management team. Always check with EMCO Site Management if you have any questions or concerns regarding scaffold, propping or temporary structures.
SITE ACTIVITIES
Framing, Sheeting and flushing of walls to various levels
Mechanical ductwork install to level 1
Formwork to various areas on GF-Level 3
Brickwork to level 1
Erection of perimeter scaffold , shade cloth
Structural steel install to lintels and perimeter angle to level 1
Fire and water services in basement to level 2
Fire Door Install to basement
CONTROLS
-No parking permitted at front car bays , all trades to park at designated area
-Exclusion zones to be maintained in high risk activity areas - Keep to designated pedestrian pathways & look out for mobile plant, trucks and warning signs.
-Trucks reversing into site require a spotter
-Hi Vis to be worn at all times
-Do not alter, remove any hop ups or handrails without Site Managers approval
Huidige weersomstandigheden op locatie
Laatst bijgewerkt om: 17:31
Temperatuur: 20C (App 17C)
Windsnelheid: 19KM/U
Max. Wind: 22KM/U @14:21
Regen sinds 9:00 uur: 0,0mm
Min.temp: 17C @07:09
Max.temp: 26C @12:49 20-11-2024
Windvlaag: 28KM/U
Max. windvlaag: 30KM/U @13:21
Waarneming Locatie - Perth, WESTERN AUSTRALIA
Tijdzone - West-Australische standaardtijd
Weerbericht - donderdag, 21 november
Mostly sunny.
Min.: 13C Max.: 24C
Kans op neerslag: 10%
Weerbericht locatie - Perth, WESTERN AUSTRALIA
Tijdzone - West-Australische standaardtijd
Morgen - vrijdag, 22 november
Sunny.
Min.: 14C Max.: 27C
Kans op neerslag: 0%
Weet u wat de PBM-vereisten voor deze locatie zijn?
Zorg dat u voor uw eerste dag op de locatie de juiste veiligheidsapparatuur hebt.
Begin sneller te werken zodra u op de locatie aankomt.
Voltooi uw locatieregistratie eenvoudig online en bespaar zo kostbare tijd.
Weet u wat de PBM-vereisten voor deze locatie zijn?
Zorg dat u voor uw eerste dag op de locatie de juiste veiligheidsapparatuur hebt.
Begin sneller te werken zodra u op de locatie aankomt.
Voltooi uw locatieregistratie eenvoudig online en bespaar zo kostbare tijd.