    Safety Notification: No individuals are to remove, adjust or alter any scaffold, propping or temporary structures under any circumstances. Without first receiving direct written permission from EMCO’s Site Management team. Always check with EMCO Site Management if you have any questions or concerns regarding scaffold, propping or temporary structures.

    SITE ACTIVITIES
    Framing, Sheeting and flushing of walls to various levels
    Mechanical ductwork install to level 1
    Formwork to various areas on GF-Level 3
    Brickwork to level 1
    Erection of perimeter scaffold , shade cloth
    Structural steel install to lintels and perimeter angle to level 1
    Fire and water services in basement to level 2
    Fire Door Install to basement


    CONTROLS
    -No parking permitted at front car bays , all trades to park at designated area
    -Exclusion zones to be maintained in high risk activity areas - Keep to designated pedestrian pathways & look out for mobile plant, trucks and warning signs.
    -Trucks reversing into site require a spotter
    -Hi Vis to be worn at all times
    -Do not alter, remove any hop ups or handrails without Site Managers approval

  • 30th september 2024, Pre Start Meeting September 30, 2024

    Pre-Start Meeting
    Safety Notification: No individuals are to remove, adjust or alter any scaffold, propping or temporary structures under any circumstances. Without first receiving direct written permission from EMCO’s Site Management team. Always check with EMCO Site Management if you have any questions or concerns regarding scaffold, propping or temporary structures.

    SITE ACTIVITIES
    Framing, Sheeting and flushing of walls to various levels
    Mechanical ductwork install to level 1
    Formwork to various areas on GF-Level 3
    Brickwork to level 1
    Erection of perimeter scaffold , shade cloth
    Structural steel install to lintels and perimeter angle to level 1
    Fire and water services in basement to level 2
    Fire Door Install to basement


    CONTROLS
    -No parking permitted at front car bays , all trades to park at designated area
    -Exclusion zones to be maintained in high risk activity areas - Keep to designated pedestrian pathways & look out for mobile plant, trucks and warning signs.
    -Trucks reversing into site require a spotter
    -Hi Vis to be worn at all times
    -Do not alter, remove any hop ups or handrails without Site Managers approval

Nettstedets værmelding
Vær på anleggsted

Sist oppdatert kl.: 17:31
Temperatur: 20C (App 17C)
Vindfart: 19KMH
Maks. Vind: 22KMH @14:21
Regn side 09.00: 0,0mm
Min. temperatur: 17C @07:09
Maks. temperatur: 26C @12:49 20.11.2024
Vindkast: 28KMH
Maks. vindkast: 30KMH @13:21


Observasjon hentet fra - Bureau of Meteorology
Observasjonssted - Perth, WESTERN AUSTRALIA
Tidssone - vestaustralsk standardtid
Værmelding – torsdag, 21 november

Mostly sunny.
Min.: 13C Maks.: 24C
Sjanse for regn: 10%


Værmelding hentet fra – Bureau of Meteorology
Sted for værmelding – Perth, WESTERN AUSTRALIA
Tidssone - vestaustralsk standardtid
I morgen - fredag, 22 november

Sunny.
Min.: 14C Maks.: 27C
Sjanse for regn: 0%


Viktige dokumenter for anleggsplassen
Ny på anleggsplassen?

Vet du om PVU-kravene for dette anlegget?

Sørg for at du har riktig sikkerhetsutstyr for den første dagen på anleggsplassen.

Se PPE-kravene til nettstedet

Kom i gang med arbeidet tidligere når du ankommer anleggsplassen.

Fullfør nettstedsregistreringen din online når det passer deg og spar tid.

Start registrering

Ny på anleggsplassen?

Vet du om PVU-kravene for dette anlegget?

Sørg for at du har riktig sikkerhetsutstyr for den første dagen på anleggsplassen.

Se PPE-kravene til nettstedet

Ny på anleggsplassen?

Kom i gang med arbeidet tidligere når du ankommer anleggsplassen.

Fullfør nettstedsregistreringen din online når det passer deg og spar tid.

Start registrering