Últimos Boletines
  • 03rd octubre 2024, Pre Start Meeting October 3, 2025

    Pre-Start Meeting
    Safety Notification: No individuals are to remove, adjust or alter any scaffold, propping or temporary structures under any circumstances. Without first receiving direct written permission from EMCO’s Site Management team. Always check with EMCO Site Management if you have any questions or concerns regarding scaffold, propping or temporary structures.

    SITE ACTIVITIES
    Framing, Sheeting and flushing of walls to various levels
    Mechanical ductwork install to level 1
    Formwork to various areas on GF-Level 3
    Brickwork to level 1
    Erection of perimeter scaffold , shade cloth
    Structural steel install to lintels and perimeter angle to level 1
    Fire and water services in basement to level 2
    Fire Door Install to basement


    CONTROLS
    -No parking permitted at front car bays , all trades to park at designated area
    -Exclusion zones to be maintained in high risk activity areas - Keep to designated pedestrian pathways & look out for mobile plant, trucks and warning signs.
    -Trucks reversing into site require a spotter
    -Hi Vis to be worn at all times
    -Do not alter, remove any hop ups or handrails without Site Managers approval

  • 30th septiembre 2024, Pre Start Meeting September 30, 2024

    Pre-Start Meeting
    Safety Notification: No individuals are to remove, adjust or alter any scaffold, propping or temporary structures under any circumstances. Without first receiving direct written permission from EMCO’s Site Management team. Always check with EMCO Site Management if you have any questions or concerns regarding scaffold, propping or temporary structures.

    SITE ACTIVITIES
    Framing, Sheeting and flushing of walls to various levels
    Mechanical ductwork install to level 1
    Formwork to various areas on GF-Level 3
    Brickwork to level 1
    Erection of perimeter scaffold , shade cloth
    Structural steel install to lintels and perimeter angle to level 1
    Fire and water services in basement to level 2
    Fire Door Install to basement


    CONTROLS
    -No parking permitted at front car bays , all trades to park at designated area
    -Exclusion zones to be maintained in high risk activity areas - Keep to designated pedestrian pathways & look out for mobile plant, trucks and warning signs.
    -Trucks reversing into site require a spotter
    -Hi Vis to be worn at all times
    -Do not alter, remove any hop ups or handrails without Site Managers approval

Pronóstico del tiempo para la Obra
Tiempo en Obra actual

Última actualización el: 4:21 PM
Temperatura: 21C (Aplicación 18C)
Velocidad del viento: 19MPH
Máx. Viento: 22MPH @2:21 PM
Lluvia desde las 9 a.m.: 0.0mm
Temp mín: 17C @7:09 AM
Temp máx: 26C @12:49 PM 11/20/2024
Ráfaga: 28MPH
Ráfagas máx: 30MPH @1:21 PM


Observación obtenida de - Bureau of Meteorology
Lugar de observación - Perth, WESTERN AUSTRALIA
Zona horaria - hora estándar de Australia occidental
Pronóstico - jueves, 21 noviembre

Mostly sunny.
Mín: 13C Máx: 24C
Probabilidad de lluvia: 10%


Pronóstico obtenido de - Bureau of Meteorology
Lugar de la previsión - Perth, WESTERN AUSTRALIA
Zona horaria - hora estándar de Australia occidental
Mañana - viernes, 22 noviembre

Sunny.
Mín: 14C Máx: 27C
Probabilidad de lluvia: 0%


Documentos importantes de la Obra
¿Primera vez en la Obra?

¿Conoce los requisitos de PPE para esta Obra?

Asegúrese de que cuento con el equipo de seguridad correcto para su primer día en la obra.

Ver los requisitos de PPE para la Obra

Empiece a trabajar en cuanto llegue a la obra.

Complete su registro de la obra en línea a su conveniencia y ahorre tiempo.

Comenzar registro

¿Primera vez en la Obra?

¿Conoce los requisitos de PPE para esta Obra?

Asegúrese de que cuento con el equipo de seguridad correcto para su primer día en la obra.

Ver los requisitos de PPE para la Obra

¿Primera vez en la Obra?

Empiece a trabajar en cuanto llegue a la obra.

Complete su registro de la obra en línea a su conveniencia y ahorre tiempo.

Comenzar registro