03rd жовтня 2024, Pre Start Meeting October 3, 2025
Pre-Start Meeting
Safety Notification: No individuals are to remove, adjust or alter any scaffold, propping or temporary structures under any circumstances. Without first receiving direct written permission from EMCO’s Site Management team. Always check with EMCO Site Management if you have any questions or concerns regarding scaffold, propping or temporary structures.
SITE ACTIVITIES
Framing, Sheeting and flushing of walls to various levels
Mechanical ductwork install to level 1
Formwork to various areas on GF-Level 3
Brickwork to level 1
Erection of perimeter scaffold , shade cloth
Structural steel install to lintels and perimeter angle to level 1
Fire and water services in basement to level 2
Fire Door Install to basement
CONTROLS
-No parking permitted at front car bays , all trades to park at designated area
-Exclusion zones to be maintained in high risk activity areas - Keep to designated pedestrian pathways & look out for mobile plant, trucks and warning signs.
-Trucks reversing into site require a spotter
-Hi Vis to be worn at all times
-Do not alter, remove any hop ups or handrails without Site Managers approval -
30th вересня 2024, Pre Start Meeting September 30, 2024
Pre-Start Meeting
Safety Notification: No individuals are to remove, adjust or alter any scaffold, propping or temporary structures under any circumstances. Without first receiving direct written permission from EMCO’s Site Management team. Always check with EMCO Site Management if you have any questions or concerns regarding scaffold, propping or temporary structures.
SITE ACTIVITIES
Framing, Sheeting and flushing of walls to various levels
Mechanical ductwork install to level 1
Formwork to various areas on GF-Level 3
Brickwork to level 1
Erection of perimeter scaffold , shade cloth
Structural steel install to lintels and perimeter angle to level 1
Fire and water services in basement to level 2
Fire Door Install to basement
CONTROLS
-No parking permitted at front car bays , all trades to park at designated area
-Exclusion zones to be maintained in high risk activity areas - Keep to designated pedestrian pathways & look out for mobile plant, trucks and warning signs.
-Trucks reversing into site require a spotter
-Hi Vis to be worn at all times
-Do not alter, remove any hop ups or handrails without Site Managers approval
Поточна погода на об’єкті
Останнє оновлення о: 17:31
Температура: 20C (Додаток 17C)
Швидкість вітру: 19км/год
Макс. вітер: 22км/год @14:21
Дощ з 9-ї ранку: 0,0мм
Мін. темп.: 17C @7:09
Макс. темп: 26C @12:49 20.11.2024
Шквал: 28км/год
Макс. пориви: 30км/год @13:21
Місцезнаходження спостереження - Perth, WESTERN AUSTRALIA
Часовий пояс — за стандартним західноавстралійським часом
Прогноз - четвер, 21 листопада
Mostly sunny.
Мін: 13C Макс.: 24C
Вірогідність дощу: 10%
Розташування прогнозу - Perth, WESTERN AUSTRALIA
Часовий пояс — за стандартним західноавстралійським часом
Завтра — п'ятниця, 22 листопада
Sunny.
Мін: 14C Макс.: 27C
Вірогідність дощу: 0%
Чи відомі вам вимоги до PPE для цього об’єкту?
Упевніться, що ви маєте правильні засоби безпеки для свого першого дня на об'єкті.
Починайте працювати швидше після прибуття на об'єкт.
Завершіть реєстрацію на об'єкті в режимі онлайн у зручний для вас час і заощадьте час.
Чи відомі вам вимоги до PPE для цього об’єкту?
Упевніться, що ви маєте правильні засоби безпеки для свого першого дня на об'єкті.
Починайте працювати швидше після прибуття на об'єкт.
Завершіть реєстрацію на об'єкті в режимі онлайн у зручний для вас час і заощадьте час.