    Safety Notification: No individuals are to remove, adjust or alter any scaffold, propping or temporary structures under any circumstances. Without first receiving direct written permission from EMCO’s Site Management team. Always check with EMCO Site Management if you have any questions or concerns regarding scaffold, propping or temporary structures.

    SITE ACTIVITIES
    Framing, Sheeting and flushing of walls to various levels
    Mechanical ductwork install to level 1
    Formwork to various areas on GF-Level 3
    Brickwork to level 1
    Erection of perimeter scaffold , shade cloth
    Structural steel install to lintels and perimeter angle to level 1
    Fire and water services in basement to level 2
    Fire Door Install to basement


    CONTROLS
    -No parking permitted at front car bays , all trades to park at designated area
    -Exclusion zones to be maintained in high risk activity areas - Keep to designated pedestrian pathways & look out for mobile plant, trucks and warning signs.
    -Trucks reversing into site require a spotter
    -Hi Vis to be worn at all times
    -Do not alter, remove any hop ups or handrails without Site Managers approval

  • 30th septembrie 2024, Pre Start Meeting September 30, 2024

    Pre-Start Meeting
    Safety Notification: No individuals are to remove, adjust or alter any scaffold, propping or temporary structures under any circumstances. Without first receiving direct written permission from EMCO’s Site Management team. Always check with EMCO Site Management if you have any questions or concerns regarding scaffold, propping or temporary structures.

    SITE ACTIVITIES
    Framing, Sheeting and flushing of walls to various levels
    Mechanical ductwork install to level 1
    Formwork to various areas on GF-Level 3
    Brickwork to level 1
    Erection of perimeter scaffold , shade cloth
    Structural steel install to lintels and perimeter angle to level 1
    Fire and water services in basement to level 2
    Fire Door Install to basement


    CONTROLS
    -No parking permitted at front car bays , all trades to park at designated area
    -Exclusion zones to be maintained in high risk activity areas - Keep to designated pedestrian pathways & look out for mobile plant, trucks and warning signs.
    -Trucks reversing into site require a spotter
    -Hi Vis to be worn at all times
    -Do not alter, remove any hop ups or handrails without Site Managers approval

Prognoza meteo șantier
Condiții meteo curente la șantier

Ultima actualizare la: 17:31
Temperatură: 20C (Aplicație 17C)
Viteza vântului: 19KMH
Max. Vânt: 22KMH @14:21
Ploaie de la 9 AM: 0,0mm
Temp min: 17C @07:09
Temp max: 26C @12:49 20.11.2024
Rafală: 28KMH
Rafală max: 30KMH @13:21


Observație obținută de la - Bureau of Meteorology
Locație observație - Perth, WESTERN AUSTRALIA
Fus orar - Ora standard a Australiei Occidentale
Prognoză - joi, 21 noiembrie

Mostly sunny.
Min: 13C Max: 24C
Șanse de ploaie: 10%


Prognoză obținută de la - Bureau of Meteorology
Locație prognoză - Perth, WESTERN AUSTRALIA
Fus orar - Ora standard a Australiei Occidentale
Mâine - vineri, 22 noiembrie

Sunny.
Min: 14C Max: 27C
Șanse de ploaie: 0%


Documente importante aferente locației
Nou în locație?

Cunoașteți cerințele EIP pentru acest șantier?

Asigurați-vă că aveți echipamentul de siguranță corect pentru prima zi la locație.

Vizualizare cerințele șantierului privind IPE

Începeți să lucrați mai devreme atunci când ajungeți în locație.

Finalizați înregistrarea la șantier online când doriți și economisiți timp.

Începeți înregistrarea

Nou în locație?

Cunoașteți cerințele EIP pentru acest șantier?

Asigurați-vă că aveți echipamentul de siguranță corect pentru prima zi la locație.

Vizualizare cerințele șantierului privind IPE

Nou în locație?

Începeți să lucrați mai devreme atunci când ajungeți în locație.

Finalizați înregistrarea la șantier online când doriți și economisiți timp.

Începeți înregistrarea