    Safety Notification: No individuals are to remove, adjust or alter any scaffold, propping or temporary structures under any circumstances. Without first receiving direct written permission from EMCO’s Site Management team. Always check with EMCO Site Management if you have any questions or concerns regarding scaffold, propping or temporary structures.

    SITE ACTIVITIES
    Framing, Sheeting and flushing of walls to various levels
    Mechanical ductwork install to level 1
    Formwork to various areas on GF-Level 3
    Brickwork to level 1
    Erection of perimeter scaffold , shade cloth
    Structural steel install to lintels and perimeter angle to level 1
    Fire and water services in basement to level 2
    Fire Door Install to basement


    CONTROLS
    -No parking permitted at front car bays , all trades to park at designated area
    -Exclusion zones to be maintained in high risk activity areas - Keep to designated pedestrian pathways & look out for mobile plant, trucks and warning signs.
    -Trucks reversing into site require a spotter
    -Hi Vis to be worn at all times
    -Do not alter, remove any hop ups or handrails without Site Managers approval

  • 30th Eylül 2024, Pre Start Meeting September 30, 2024

    Pre-Start Meeting
    Safety Notification: No individuals are to remove, adjust or alter any scaffold, propping or temporary structures under any circumstances. Without first receiving direct written permission from EMCO’s Site Management team. Always check with EMCO Site Management if you have any questions or concerns regarding scaffold, propping or temporary structures.

    SITE ACTIVITIES
    Framing, Sheeting and flushing of walls to various levels
    Mechanical ductwork install to level 1
    Formwork to various areas on GF-Level 3
    Brickwork to level 1
    Erection of perimeter scaffold , shade cloth
    Structural steel install to lintels and perimeter angle to level 1
    Fire and water services in basement to level 2
    Fire Door Install to basement


    CONTROLS
    -No parking permitted at front car bays , all trades to park at designated area
    -Exclusion zones to be maintained in high risk activity areas - Keep to designated pedestrian pathways & look out for mobile plant, trucks and warning signs.
    -Trucks reversing into site require a spotter
    -Hi Vis to be worn at all times
    -Do not alter, remove any hop ups or handrails without Site Managers approval

Saha Hava Durumu Tahmini
Geçerli Saha Hava Durumu

Son Güncelleme Saati: 17:31
Sıcaklık: 20C (App 17C)
Rüzgar Hızı: 19KMH
Maks. Rüzgar: 22KMH @14:21
Saat 9'dan beri yağmurlu: 0,0mm
Min Sıcaklık: 17C @07:09
Maks Sıcaklık: 26C @12:49 20.11.2024
Bora: 28KMH
Maks Bora: 30KMH @13:21


Gözlem kaynağı - Bureau of Meteorology
Gözlem Konumu - Perth, WESTERN AUSTRALIA
Zaman Dilimi - Batı Avustralya Standart Saati
Tahmin - Perşembe, 21 Kasım

Mostly sunny.
Min: 13C Maks: 24C
Yağmur İhtimali: 10%


Tahmin kaynağı - Bureau of Meteorology
Tahmin Konumu - Perth, WESTERN AUSTRALIA
Zaman Dilimi - Batı Avustralya Standart Saati
Yarın - Cuma, 22 Kasım

Sunny.
Min: 14C Maks: 27C
Yağmur İhtimali: 0%


Önemli Saha Belgeleri
Sahada Yeni misiniz?

Bu sahanın KKD Gereksinimlerini biliyor musunuz?

Sahadaki ilk gününüzde doğru güvenlik ekipmanlarına sahip olduğunuzdan emin olun.

Saha KKD Gereksinimlerini Görüntüle

Sahaya geldiğinizde kısa süre içinde çalışmaya başlamak için hazırlanın.

Saha kaydınızı çevrimiçi tamamlayın ve zamandan kazanın.

Kayda Başla

Sahada Yeni misiniz?

Bu sahanın KKD Gereksinimlerini biliyor musunuz?

Sahadaki ilk gününüzde doğru güvenlik ekipmanlarına sahip olduğunuzdan emin olun.

Saha KKD Gereksinimlerini Görüntüle

Sahada Yeni misiniz?

Sahaya geldiğinizde kısa süre içinde çalışmaya başlamak için hazırlanın.

Saha kaydınızı çevrimiçi tamamlayın ve zamandan kazanın.

Kayda Başla