MELVISTA
Recent Bulletins
  • 03rd October 2024, Pre Start Meeting October 3, 2025

    Pre-Start Meeting
    Safety Notification: No individuals are to remove, adjust or alter any scaffold, propping or temporary structures under any circumstances. Without first receiving direct written permission from EMCO’s Site Management team. Always check with EMCO Site Management if you have any questions or concerns regarding scaffold, propping or temporary structures.

    SITE ACTIVITIES
    Framing, Sheeting and flushing of walls to various levels
    Mechanical ductwork install to level 1
    Formwork to various areas on GF-Level 3
    Brickwork to level 1
    Erection of perimeter scaffold , shade cloth
    Structural steel install to lintels and perimeter angle to level 1
    Fire and water services in basement to level 2
    Fire Door Install to basement


    CONTROLS
    -No parking permitted at front car bays , all trades to park at designated area
    -Exclusion zones to be maintained in high risk activity areas - Keep to designated pedestrian pathways & look out for mobile plant, trucks and warning signs.
    -Trucks reversing into site require a spotter
    -Hi Vis to be worn at all times
    -Do not alter, remove any hop ups or handrails without Site Managers approval

  • 30th September 2024, Pre Start Meeting September 30, 2024

    Pre-Start Meeting
    Safety Notification: No individuals are to remove, adjust or alter any scaffold, propping or temporary structures under any circumstances. Without first receiving direct written permission from EMCO’s Site Management team. Always check with EMCO Site Management if you have any questions or concerns regarding scaffold, propping or temporary structures.

    SITE ACTIVITIES
    Framing, Sheeting and flushing of walls to various levels
    Mechanical ductwork install to level 1
    Formwork to various areas on GF-Level 3
    Brickwork to level 1
    Erection of perimeter scaffold , shade cloth
    Structural steel install to lintels and perimeter angle to level 1
    Fire and water services in basement to level 2
    Fire Door Install to basement


    CONTROLS
    -No parking permitted at front car bays , all trades to park at designated area
    -Exclusion zones to be maintained in high risk activity areas - Keep to designated pedestrian pathways & look out for mobile plant, trucks and warning signs.
    -Trucks reversing into site require a spotter
    -Hi Vis to be worn at all times
    -Do not alter, remove any hop ups or handrails without Site Managers approval

Site Weather Forecast
Current Site Weather

Last Updated at: 3:11 PM
Temperature: 22C (App 20C)
Wind Speed: 15KMH
Max. Wind: 22KMH @2:21 PM
Rain since 9AM: 0.0mm
Min Temp: 17C @7:09 AM
Max Temp: 26C @12:49 PM 20/11/2024
Gust: 19KMH
Max Gust: 30KMH @1:21 PM


Observation sourced from - Bureau of Meteorology
Observation Location - Perth, WESTERN AUSTRALIA
Time Zone - Australian Western Standard Time
Forecast - Thursday, 21 November

Mostly sunny.
Min: 13C Max: 24C
Chance of Rain: 10%


Forecast sourced from - Bureau of Meteorology
Forecast Location - Perth, WESTERN AUSTRALIA
Time Zone - Australian Western Standard Time
Tomorrow - Friday, 22 November

Sunny.
Min: 14C Max: 27C
Chance of Rain: 0%


Important Site Documents
New to Site?

Do you know the PPE Requirements for this site?

Ensure you have the correct safety equipment for your first day at the site.

View Site PPE Requirements

Get started working sooner when you arrive on site.

Complete your site registration online at your convenience and save yourself time.

Begin Registration

New to Site?

Do you know the PPE Requirements for this site?

Ensure you have the correct safety equipment for your first day at the site.

View Site PPE Requirements

New to Site?

Get started working sooner when you arrive on site.

Complete your site registration online at your convenience and save yourself time.

Begin Registration